This is the second in a series of articles on how the changes introduced by the 2024 JCT (Joint Contracts Tribunal) contracts will impact the practical administration of the JCT contractual mechanisms.

In this article, we look specifically at the insolvency related provisions in the 2024 Design and Build (D&B) contract and the 2024 Intermediate Building Contract with Contractor’s design (ICD) contract. We address the updates to the definition of insolvency, the impact of those changes for Employers and Contractors and the related knock-on impact to sub-contracts.

The recent Privy Council decision in Sian Participation Corp (In Liquidation) v Halimeda International Ltd[2024] (SPC) has overturned a principle of English law relating to the interaction between a contractual agreement to arbitrate and traditional insolvency measures where a debt is said to be disputed without substantial grounds.

10 years after the publication of Revision 6 (2014 edition) of the Model Form of Contract for the design, supply and installation of electrical, electronic and mechanical plant (MF/1), the Institution of Engineering and Technology (IET) has released Revision 7 (2024 edition), shortly followed by an erratum containing a summary of corrections.

Regular users of the MF/1 may be comforted to know that the risk profile of the contract has not changed though the door has been opened to extending the duration of liability for latent defects, as discussed below.

Another groundbreaking judgment from the ADGM Courts in the NMC matter 📢🇦🇪👨🏻⚖️ and another example of the ADGM Courts drawing important parallels between ADGM and English law.

English proceedings re NMC Health Plc are also ongoing. In his judgment at CFI on 8 July 2024, Sir Justice Andrew Smith found that:

1. The ADGM Courts can make an order in respect of the fraudulent carrying on of the business of a company prior to the time at which that company was continued in the ADGM.

Introduction

What happens when monies are loaned for a specific purpose but that purpose fails? Should those monies fall within the general assets of the recipient upon bankruptcy or insolvency?

When a contracting party declares bankruptcy, it is crucial to grasp the implications for existing contracts. This article highlights the most important legal ramifications for the non-bankrupt parties involved.

Continuation or Termination

In a recent judgment1, the High Court determined (contrary to the arguments of the affected secured creditor) that a debenture created a floating charge rather than a fixed charge over certain internet protocol (IP) addresses. Whilst elements of the decision are inevitably fact-specific, some broader lessons and reminders can be taken from the judgment which will be of general relevance to lenders when taking security.

The recent case of Re UKCloud Ltd (in liquidation) [2024] EWHC 1259 (Ch) (24 May 2024) looked at whether a charge over Internet Protocol (IP) Addresses was a fixed or floating charge. Notwithstanding that the charging document purported to create a fixed charge over such asset, the High Court concluded that it was a floating charge primarily because the control provisions in the charging document were not complied with or enforced in practice.

Introduction

When parties agree to submit disputes to arbitration there is often language defining the issues that can be determined by arbitration, such as ‘any dispute arising out of or in connection with this contract, including any question regarding its existence, validity or termination’ (LCIA recommended clause). Once a dispute has arisen the exact scope of the issues before the arbitral tribunal will likely be detailed in the terms of reference or other procedural document.