If a building contractor becomes insolvent, but the build is covered by an NHBC Buildmark warranty providing insolvency cover, when does time start to run for the insured to start proceedings against an insurer who fails to pay a claim?

The Technology and Construction Court (TCC) has recently considered this question in the context of an application for summary judgment made by the NHBC, in Peabody Trust v National House-Building Council [2024].

This week’s TGIF considers a recent decision of the Supreme Court of New South Wales (Forex Capital Trading Pty Ltd (in liquidation) v Invesus Group Limited [2024] NSWSC 867). Justice Ball determined that admission of a proof of debt by a liquidator was not akin to a judgment or settlement, and that such an admission did not create a new liability of the company.

Recent high-profile contractor collapses have made many acutely aware of the need to ensure they are adequately protected in the event of employer or contractor insolvency. This increase in insolvencies has also placed significant stress on the construction bond market. Contractor insolvencies put pressure on surety bond providers, which in turn can lead to increased rates and more stringent criteria being imposed on contractors seeking bonds.

In a recent decision of the Supreme Court of New South Wales (In the matter of Pacific Plumbing Group Pty Limited (in liquidation) [2024] NSWSC 525), Justice Black determined that a payment made by a third party was not an unfair preference because the payment did not diminish assets available to creditors.

Key Takeaways

The Federal Court in Morgan, in the matter of Traditional Values Management Limited (in liq)[2024] FCA 74, approved an abridged process that allowed the liquidator to admit debts of a group of unsecured creditors without requiring a formal proof of debt.

Key Takeaways

In this week’s TGIF, we consider the Court of Appeal’s decision in Anchorage Capital Master Offshore Ltd v Sparkes [2023] NSWCA 88 and the challenges faced by lenders in accepting representations as to solvency and the financial position of borrowers.

Key takeaways

The First-tier Tribunal (FTT) has made what is understood to be the first Remediation Contribution Order under the Building Safety Act 2022 (BSA) in connection with the remediation of building safety defects at a high-rise residential block at 9 Sutton Court Road, in London.

This week’s, TGIF considers the Court of Appeal’s decision in Westgem Investments Pty Ltd v Commonwealth Bank of Australia Ltd [2022] WASCA 132, handed down on 4 November 2022 in favour of the Commonwealth Bank of Australia Ltd and Lloyds Banking Group (Financiers).