10 years after the publication of Revision 6 (2014 edition) of the Model Form of Contract for the design, supply and installation of electrical, electronic and mechanical plant (MF/1), the Institution of Engineering and Technology (IET) has released Revision 7 (2024 edition), shortly followed by an erratum containing a summary of corrections.
Regular users of the MF/1 may be comforted to know that the risk profile of the contract has not changed though the door has been opened to extending the duration of liability for latent defects, as discussed below.
Introduction
When parties agree to submit disputes to arbitration there is often language defining the issues that can be determined by arbitration, such as ‘any dispute arising out of or in connection with this contract, including any question regarding its existence, validity or termination’ (LCIA recommended clause). Once a dispute has arisen the exact scope of the issues before the arbitral tribunal will likely be detailed in the terms of reference or other procedural document.
A large number of UK companies are in significant financial distress at the moment.
The rising strength of the United Arab Emirates as a commercial powerhouse has continued as the Covid-19 pandemic recedes. The UAE was a key business hub prior to 2020, but the flow of money and talent into the country has increased since then, driven by numerous factors including the UAE’s business-friendly climate, its stable political regime, and the access to fair and transparent justice mechanisms.