We're often asked to advise on what is the appropriate level of liquidated damages for delay in a building contract. Whilst this is a commercial issue and therefore outside the remit of legal advice there are some principles relating to the application of liquidated damages that we can bring to the parties' attention.

Modular construction has been heralded for several years now as a construction methodology that saves time, reduces waste and minimises cost. It is therefore unsurprising that modular construction forms part of the various "modern methods of construction" that are now being encouraged by the UK Government. Use of modular construction can range from isolated elements like bathroom pods to where the majority of the building is comprised of modules and is commonly encountered in housing, student accommodation and hotels.

Wirecard's insolvency administrator has won a first victory before the Munich I Regional Court. On 5 May, the court declared the annual financial statements for 2017 and 2018, which show balance sheet profits totalling around EUR 600 million, null and void. Dividends of around EUR 47 million were distributed to Wirecard's shareholders from these profits, which probably never existed. As a consequence of the nullity of the annual accounts, the resolutions on the utilisation of the balance sheet profits are also null and void.

Die anhaltenden Auswirkungen der Covid-19-Pandemie auf die Hotelbranche und eine mögliche Restrukturierungsoption

Über zwei Jahre nach Ausbruch der Covid-19-Pandemie sind deren Auswirkungen auf die deutsche Wirtschaft immer noch deutlich spürbar. Insbesondere die Hotelbranche ist von der sogenannten 4. Welle, den derzeitigen Rekordinzidenzen sowie den damit verbundenen staatlich angeordneten Einschränkungen wie 2G (Plus)- bzw. 3G-Regelungen weiterhin stark betroffen.

The majority of the building and engineering contracts that we encounter (and draft) require some form of performance security from the contractor, whether this is a parent company performance guarantee granted by the contractor's ultimate holding company, or a performance bond granted by a third party surety or a bank for a capped sum. Indeed most, if not all, standard form contracts provide for these forms of security, even if only as an option.

Das Gesetzgebungsverfahren zum Gesetz zur Fortentwicklung des Sanierungs- und Insolvenzrechts („SanInsFoG“) schreitet in beachtlicher Geschwindigkeit voran. Seit 14. Oktober 2020 liegt der Regierungsentwurf („RegE“) vor. Das Gesetz beinhaltet neben der Einführung des Unternehmensstabilisierungs- und Restrukturierungsgesetzes („StaRUG“) auch einige Änderungen in der Insolvenzordnung. Trotz der teilweise massiven Verschärfung der Geschäftsleiterpflichten durch das SanInsFoG, sieht der RegE auch eine Erleichterung gegenüber der aktuellen Rechtslage vor.

Teilweise Erleichterung für Geschäftsleiter – Haftungsgefahren für Zahlungen bei Insolvenzreife gegenüber der aktuellen BGH-Rechtsprechung vermindert