10 years after the publication of Revision 6 (2014 edition) of the Model Form of Contract for the design, supply and installation of electrical, electronic and mechanical plant (MF/1), the Institution of Engineering and Technology (IET) has released Revision 7 (2024 edition), shortly followed by an erratum containing a summary of corrections.
Regular users of the MF/1 may be comforted to know that the risk profile of the contract has not changed though the door has been opened to extending the duration of liability for latent defects, as discussed below.
The good news is that public works construction projects for municipalities are projected to remain a major sector of construction activity for the foreseeable future. The not-so-good news is that municipal bankruptcy filings are on the rise, and they are likely to increase. The issues facing parties under contract with a municipality when it files for bankruptcy protection are playing out nationally in places like Stockton, California, and Detroit, Michigan.