This is the second in a series of articles on how the changes introduced by the 2024 JCT (Joint Contracts Tribunal) contracts will impact the practical administration of the JCT contractual mechanisms.

In this article, we look specifically at the insolvency related provisions in the 2024 Design and Build (D&B) contract and the 2024 Intermediate Building Contract with Contractor’s design (ICD) contract. We address the updates to the definition of insolvency, the impact of those changes for Employers and Contractors and the related knock-on impact to sub-contracts.

RE Z III Trust [2019] JRC 069

The Royal Court of Jersey has determined that the preferred course to follow when winding up an insolvent trust is for the existing trustee to apply a formal winding up procedure under the Court's supervision. Key features of this procedure would be (i) a moratorium on legal claims; (ii) the trustee should advertise for claims on the trust assets; and (iii) the trustee should require creditors to prove their claims before distributing the assets.

The Z Trusts litigation